| ₹ 91515.0 includes GST and import duties. | |
| B2B customers can avail ₹ 13956.04 ITC on this product | |
| 100% Secure Payments | 100% Genuine product | |
| The product is eligible for Free Shipping |
Description
The Flowline 600N Professional Ergonomic Camera Support Vest from FLYCAM is a body-worn vest support system that is adjustable to support camera rigs weighing 26.4 to 33 lb. The system works by using a suspension line to support the weight of the gimbal rig, taking the load off your shoulder, neck, and arm muscles, and distributing it across your torso.
The tension line is adjustable by turning a screw on the top bar, letting you dial in the appropriate amount of tension for your rig. The system consists of the vest, a support bar, a line tightening knob, and an 18.5" top bar with a 5" support arm extension. The vest is adjustable for hip sizes from 34 to 56", and it is optimized for use with motorized gimbal stabilizers, providing increased lower back support that allows you to carry weights further away from your body. A carrying bag is also included for convenient storage and transport of the Flowline 600N system.
Features- 26.4 to 33 lb load capacity
- Heavy-duty camera hook
- Tightening knob to adjust line length
- Line extends to 42" when fully stretched
- Adjustable vest and waist belt made of breathable fabric
| Stabilizer Type | Vest System |
| Load Capacity | 26.46 to 33.07 lb / 12 to 15 kg |
| Height | 23.62 to 39.37" / 60 to 100 cm |
| Weight | 8.82 lb / 4 kg |
| Counterweights | None |
| Belt Size | 34.25 to 55.91" / 87 to 142 cm |
| Suspension Line Length | 42.13" / 107 cm |
| Package Weight | 20 lb |
| Box Dimensions (LxWxH) | 24.9 x 19 x 8.9" |
In the Box
- FLYCAM Flowline 600N Professional Ergonomic Camera Support Vest
- Carry Bag
- Limited 1-Year Warranty
All product and company names are trademarks™ or registered® trademarks of their respective holders. Use of them does not imply any affiliation with or endorsement by them.
Bulk Discount
| Quantity | Price |
| 2 | ₹ 89684.7 |
| 3-5 | ₹ 88769.55 |
| 5-10 | ₹ 86939.25 |
| 10+ | ₹ 85108.95 |
Bulk discount will be automatically applied during checkout based on quantity.